Second Position MCA for Contractors
A second position MCA for contractors is a purchase of future receivables that a partner may review while an earlier advance still debits the operating account. Job costs go out before progress billing comes back. A signed job is not a deposit. LoanQuail is a broker, not a lender, and does not decide the file. The advance is not a loan. This page is not an offer.
Last reviewed .
Prefer to talk? (507) 473-8789
Job cost goes out before the draw comes in
A contractor buys materials, pays a permit, and staffs the crew before the draw for that work arrives. A roof, a kitchen remodel, an electrical rough-in, or a concrete flatwork job all share that order of events even though the trades are different. The account can be busy with outgoing wires in a week when nothing comes in. Contractor working capital is that gap. It is not the contract amount, and it is not retainage you hope to collect at the end.
Retainage held back until the end of a job is not cash in the account. A punch-list holdback is the same kind of delay. Progress billing follows the schedule in the agreement, which may be monthly even when payroll is weekly. Weather can pause exterior work so a crew week happens with no draw at all. Interior work can continue and still be waiting on the billing cycle. None of those pauses the advance you already have.
Materials, crew payroll, and insurance timing
The cash is usually for materials that have to be on site before the crew starts, for crew payroll between draws, for a tool or a rental the job requires, or for an insurance bill or a bond premium that is due before the next billing. A deposit you must send to a subcontractor is the same pattern: money leaves now, and the related draw may not. Say which of those it is. A file that says materials, when the need is payroll, will not match the account.
A contractor cash advance with an existing advance adds a debit on top of that timing. It does not collect the draw, and it does not release retainage. Second position MCA funding explains the added debit. If the open advance was taken the week a large draw landed, the next quiet weeks are the ones that matter.
How funders read an existing advance on a contractor account
Deposits from this trade are lumpy. Reviewers do not average a strong draw month into a smooth week. They look for whether the open debit still clears in a week when no draw lands, after crew payroll and the ordinary bills. A transfer from the owner, a prior advance, or a single large draw should be labeled so it is not mistaken for the ordinary week. A returned debit in a gap between billings stays in the file.
A signed contract, a notice to proceed, or a schedule of values is context. It is not a deposit. There is no job-size rule on this page that makes a second position acceptable. The partner either sees that a typical gap week can carry the current debit and a new one, or it does not. Second position MCA requirements is the usual document list, and the numeric bars vary by funder.
Contractor working capital between billings
Contractor working capital, searched alongside an existing advance, means staying able to buy materials and pay the crew while a debit is already leaving. It is a poor fit when the current debit already fails in the weeks between draws. Adding another debit does not make the general contractor pay sooner, and it does not turn retainage into cash. If several advances are open, read multiple MCA positions before you add one more.
A renewal with the current funding company replaces that one agreement. It is a different comparison from a second position, and it still depends on that company. More than one merchant cash advance separates the two. If a bank or equipment note is also open, read an MCA with an existing business loan. The clause in your current advance still controls whether another company may debit the account.
What a contractor file should include
Include statements that show a draw week and a gap week. List every open advance, the debit, and any return. Describe the job cost in plain words: materials on site, crew payroll, a rental, insurance, or a bond premium. Do not describe a signed job as money received. If weather stopped exterior work, say that the gap is in the statements rather than asking a reviewer to imagine it.
The broader pages are construction funding and construction company funding. Start an application when the statements and the open debits are listed. Sending it does not start a job, release a draw, or create an offer.
What you'll need
- About four months of operating-account statements, including a draw week and a gap week, with every page
- A plain note on progress billing and any retainage, without treating a signed job as a deposit
- Each open advance: funding company, debit, daily or weekly schedule, and any returned payment
- The use, such as materials, crew payroll, a rental, insurance, or a bond premium, and any written payoff you already have
Related
Frequently Asked Questions
What is a second position MCA for contractors?
It is a purchase of future receivables reviewed while a contractor's advance is still being repaid. Job costs leave before the draw returns. A signed job is not cash. LoanQuail is a broker, not a lender. The advance is not a loan.
Does a signed contract count as a deposit?
No. A contract, a schedule of values, or a notice to proceed can explain the file. Only money that reached the account is a deposit. Retainage that is still held back is not cash either.
Can the cash cover materials or crew payroll between draws?
Those are the usual uses, along with a rental, insurance, or a bond premium. The open debit keeps running in the gap week. This page does not set an amount, and naming the use is not an offer.
What if weather stops the work?
Exterior work can pause while payroll and the current debit continue. Say so, and let the statements show the gap. A pause does not move the debit, and it is not a reason to hide a returned payment.
What if the contractor agreement limits another advance?
Job pressure does not rewrite the clause. Ask the current funding company what consent it requires and keep the answer. A qualified advisor can read the contract. This page is not legal advice and it is not a reading of your agreement.
What should a contractor send?
Statements with both a draw week and a gap week, every open advance, and the job cost you would actually pay. Apply with that file. Construction funding is the broader industry page. A complete file is a review, not a draw.